Not being happy with the finish Alan decided to redo them, increasing the plate thickness from 1 to 1.5 mm.
The new tender side panels have taken a lot of time marking out, centre punching and drilling, then deburring the rivet holes. Riveting itself should take about another 17 hours.
Leave a Reply