Due to signalling works at the station of Never Doit, the railway board have decided in their wisdom to lengthen the span of the footbridge due to the positioning of the new signal at the end of the platform. The footbridge is built and in the process of being painted at the builders. Further updates will be posted.

Leave a Reply