Proposals for Improvements to O Gauge   Leave a comment

Track Work
Fit Micro switches to points that have not already got them and route wiring under baseboards.
Overhaul top goods yard point levers.
Add new levers to engine yard and hook up to points. Revamp signaling and/or replace.
Repair or replace point/signal levers on middle station.
Rewire top station goods departure road.

Turntables
Fit latches to lower shed turntable.
Fit motor drive to top shed table (in stock).

Building and Scenery
Bring up to a better standard.

Further Options
New MPD where the colliery is currently sited.
Replacing ballast as required.

Posted 25/11/2019 by keithspenceuk in Model Railway Club

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: